In addition to anaerobic digestion taking place in the primary settlement chamber [2] the Ensign unit allows the clarified water to pass into a second ‘aeration’ chamber [3] where it is treated to remove the dissolved constituents. Here aerobic bacteria, supported by diffused air and mobile media, ensures full treatment is achieved before the treated effluent and ‘sloughed off’ bacteria flows to a final settlement chamber [10]. The final effluent is then discharged to the drainage field or watercourse via a Polylok filter.
KEY
- Inlet
- Primary settlement chamber
- Aeration chamber
- Compressor with alarm
- Compressor housing (External or internal options)
- RCD / Electrical connection
- PVC pressure pipe for diffuser(s)
- Bio-media
- Stainless steel mesh
10. Final settlement chamber
11. Sludge return
12. Unique Polylok tertiary filter (Only on Ensign:Ultra units)
13. Outlet
14. Access lid
15. Integral lifting eyes
16. Stabilising feet
17. Unique ‘keying-in’ lip